Skip to content
2000
Volume 14, Issue 2
  • ISSN: 1872-2121
  • E-ISSN: 2212-4047

Abstract

Background: Planning and scheduling of manufacturing enterprises are required to be rapid and accurate, which make is easy for the traditional enterprise resource planning system to meet the needs of enterprises. Objective: This paper introduces the theory of constraints and explains the control methods for production planning and scheduling. Methods: The main characteristics of the advanced planning and scheduling system are analyzed. Then, the modeling method based on the theory of constraints is used to study the scheduling path. Results: An example is given to validate the scheduling model and realize the optimization of production tasks on the bottleneck resources. Conclusion: The feasibility of the advanced planning and scheduling methods based on the theory of constraints is proved.

Loading

Article metrics loading...

/content/journals/eng/10.2174/1872212113666191119103505
2020-06-01
2025-07-12
Loading full text...

Full text loading...

/content/journals/eng/10.2174/1872212113666191119103505
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error
Please enter a valid_number test